More delays for NASA’s moon rocket test, fueling stalled
18:44 JST, April 6, 2022
CAPE CANAVERAL, Fla. (AP) — NASA’s dress rehearsal for its mega moon rocket is off until at least this weekend because of a pair of technical problems that kept stalling a fueling test.
Launch managers tried twice — once Sunday and again Monday — to load nearly 1 million gallons of fuel into the 322-foot (98-meter) rocket known as Space Launch System, or SLS. Balky fans at the launch pad thwarted the first effort, while an improperly closed valve halted the second attempt.
The countdown test is the last major milestone before the rocket’s long-awaited launch debut. The Orion crew capsule atop the rocket will be hurled to the moon in a passenger-less test flight, looping around but not landing before returning to Earth. NASA is targeting June, depending on how the demo goes.
“We didn’t get through everything we wanted, but certainly learned a great deal that we’ll take into our next attempt,” said NASA’s Jim Free, who’s in charge of exploration systems development.
Speaking Tuesday at the Space Foundation’s annual conference in Colorado Springs, Free said the launch team will wait until SpaceX launches four private passengers to the International Space Station before taking another crack at the fueling test. Liftoff is scheduled for Friday from Kennedy Space Center, barely a mile from the pad holding the SLS rocket.
Managers declined to specify a date for the next SLS fueling attempt, but noted they would not have to start the test from scratch.
The dress rehearsal began Friday and should have lasted just two days. A severe thunderstorm resulted in four lightning strikes at the pad Saturday, but officials did not believe that caused any of the technical problems. They described the problems as nuisances — not design issues.
“The rocket is fine. The spacecraft (capsule) is fine. We’ve just got to get through the test and the test objectives,” mission manager Mike Sarafin told reporters.
After this first moonshot in NASA’s Artemis program, NASA will send a crew around the moon in 2024 and then attempt the first lunar landing by astronauts in 2025 or so. Astronauts last walked on the moon in 1972 during NASA’s Apollo program.
"News Services" POPULAR ARTICLE
-
New Rules Drive Japanese Trucking Sector to the Brink
-
G-Shock Watchmaker Casio Delays Earnings Release Due to Ransomware Attack
-
North Korea Long-Range Ballistic Missile Test Splashes Down between Japan and Russia (UPDATE 1)
-
Japan’s Nikkei Stock Closes at 2-week Peak as Tech Shares Track Nasdaq Higher (Update 1)
-
Nissan Plans 9,000 Job Cuts, Slashes Annual Profit Outlook
JN ACCESS RANKING
- Streaming Services Boost Anime Popularity Overseas; Former ‘Geeky’ Interest More Beloved Among Gen Z than 3 Major U.S. Sports
- G20 Sees Soft Landing for Global Economy; Leaders Pledge to Resist Protectionism as Trump Calls for Imported Goods Flat Tariff
- 2024 POLLS: Ruling Camp Likely to Win Lower House Majority
- Chinese Rights Lawyer’s Wife Seeks Support in Japan; Sophie Luo Calls for Beijing to Free Ding Jiaxi, Xu Zhiyong
- Chinese Social Media Still Full of Anti-Japanese Posts 1 Month After Boy’s Fatal Stabbing; Malicious Videos Gain Large Number of Views