
The Mihama nuclear power plant is seen in Fukui Prefecture on Oct. 26.
16:36 JST, November 10, 2022
Nuclear Regulation Authority Chairman Shinsuke Yamanaka expressed reservations about a proposal by the Economy, Trade and Industry Ministry to set the maximum operational period of nuclear power plants beyond the current upper limit of 60 years.
Currently, the operating period of a nuclear power plant is legally set at 40 years in principle, extendable to a maximum of 60 years, but the ministry is aiming to raise that ceiling.
On Tuesday, the ministry presented a panel of experts with three proposals: maintaining the current regulations; setting no upper limit on the operating period; setting a certain limit but not counting periods when the plant is shut down toward the total operating period.
The last option “would make it very difficult to design” safety regulations, Yamanaka said at a press conference on Wednesday.
“It is important for safety regulations to look at the status of nuclear power plants on a calendar year basis [without excluding offline periods],” Yamanaka said.
He placed importance on the rule under which nuclear power plants are subject to regulations from the time when they become operational. Among the reasons for this stance, he said that concrete used in plant buildings and other related structures deteriorates over time, even when the plants are not in operation.
Envisioning nuclear power plants being allowed to operate for more than 60 years, the NRA is looking into a proposal to check the safety of plants no less frequently than every 10 years after 30 years of operation.
Top Articles in Business
-
Foreign Tourists Set New Record in March; 30% Drop in Visitors from Middle East
-
Japan’s ANA to Introduce Fuel Surcharges to Domestic Flights from Fy27, Driven by Rising Fuel Costs, Declining Profits
-
Toyota Motor to Begin Full-Scale Hydrogen Production in May; Mass Production and Sales of Equipment Planned to Start in 2029
-
Middle Powers Should Create Alternative to WTO, Says Research Group
-
Airborne Cellular Stations to Be Tested in Ishikawa, Miyagi; Aim to Ensure Communication During Disasters
JN ACCESS RANKING
-
Earthquake Hits Japan’s Tohoku Region; 3-meter Tsunami Warning Issued (Update 1)
-
Police Find Child’s Shoe During Search for Missing Boy in Nantan, Kyoto Prefecture
-
Body Found in Nantan, Kyoto Prefecture, During Search for 11-Year-Old Boy in Area (Update 1)
-
China, South Korea Object to Japanese PM Takaichi’s Ritual Offering to Yasukuni Shrine
-
Cherry Blossoms, Rapeseed Flowers Perform Colorful ‘Duet’ in Niigata
Most read in the last 24 hours
-
Govt May Revise Law to Allow Export of Defense Equipment for Free
-
Undrafted Japanese Kicker Signs with Raiders; ‘My Appeal Is My Ac...
-
Number of Immigration Officer-Escorted Forced Deportations in Jap...
-
Spring Bear Hunting Gets Fully Underway As Prefectures Deal With ...
-
Dutch Man Injured on Closed Mt. Fuji Route, Having Fallen While D...
Most read in the last 7 days
-
Earthquake Hits Japan's Tohoku Region; 3-meter Tsunami Warning Is...
-
China, South Korea Object to Japanese PM Takaichi's Ritual Offeri...
-
Trump Extends the Ceasefire with Iran but Keeps the Blockade
-
India's Arms Indigenization Quest for Self-Reliance / New Delhi S...
-
¥1,000 Coins to Be Issued to Mark Anniversary of Beginning of Jap...
Most read in the last 30 days
-
Earthquake Hits Japan's Tohoku Region; 3-meter Tsunami Warning Is...
-
Police Find Child's Shoe During Search for Missing Boy in Nantan,...
-
Body Found in Nantan, Kyoto Prefecture, During Search for 11-Year...
-
China, South Korea Object to Japanese PM Takaichi's Ritual Offeri...
-
Cherry Blossoms, Rapeseed Flowers Perform Colorful ‘Duet’ in Niig...

